
Standby Generators Belfast & Northern Ireland
BSH Limited integrates standby generators with the heating, cooling and on-site power plant it delivers, so backup power is coordinated with CHP and control systems rather than installed as a separate electrical package.
Standby Generators Belfast reflects BSH Limited's combined mechanical and electrical approach. BSH designs combination fuelled systems that include heating, cooling, combined heat and power, domestic and control systems as required — and standby generation is what keeps the critical plant running when the imported supply is interrupted.
Because BSH carries the mechanical and electrical scope together, a standby generator is specified as part of the same package: the transfer switch, protection and coordination with CHP and BEMS are designed with the plant rather than added after it is installed.
On a pre-packaged plantroom the standby integration is part of the off-site build, wired and tested in a controlled environment so it is ready to commission on connection rather than first-wired on site under time pressure.
Coordinating backup power with the plant
Standby generation covers the generator, transfer switch and distribution that keep a building's critical heating, cooling and on-site power plant running during a supply interruption. On a combination fuelled system this includes coordinating the standby set with CHP generation and the BEMS so the plant restarts in a controlled sequence.
Specified with the plant, not after it
Because BSH carries HV and LV electrical capability, the standby generator is part of the same engineering package. Protection settings, transfer logic and load shedding are designed with the mechanical plant rather than added after it is installed.
Integrated within a pre-packaged plantroom
Where the plantroom is pre-packaged, the standby control panel and wiring are built and tested during off-site fabrication, so on-site commissioning is rapid hook-up and verification rather than first-time wiring under time pressure.
Commercial applications
Where this service applies
- Plantrooms needing backup power for critical heating and cooling
- Buildings combining standby generation with CHP
- Projects requiring coordinated restart after a supply interruption
- Pre-packaged plantrooms with factory-tested standby integration
Benefits & considerations
What to consider
- Standby generation coordinated with CHP and BEMS
- Transfer logic designed with the mechanical plant
- HV and LV capability in one engineering package
- Factory-tested integration for rapid on-site commissioning
Problem · Reaction · Solution
How BSH can help
Problem
When a standby generator is installed separately from the heating, cooling and on-site power plant it protects, the transfer logic is designed without real knowledge of how the CHP, boilers and chillers will restart together. A generator that can carry the load on paper can stall the plant on a real interruption because the restart sequence was never coordinated.
Reaction
Facilities managers and building owners need standby generation designed with the plant so the whole system restarts in a controlled sequence after a supply interruption. A standby set retrofitted to uncoordinated plant leaves the operator managing restarts by trial and error under real pressure.
Solution
BSH integrates standby generators as part of its combined mechanical and electrical delivery, so backup power is coordinated with the heating, cooling and on-site power plant from the outset. Because the right standby strategy depends on your building and plant, the next step is to discuss your requirements with BSH's engineers. Contact BSH to discuss your standby generators project.
Questions & answers
Common commercial questions
Discuss your standby generators project
Talk to BSH about integrating standby generation with your heating, cooling and on-site power plant.
Contact us